Salisbury and Fruitland units were operating interior while Truck 74 was assigned to RIT. There was a heavy fire load in the attic of the structure and operations were changed to defensive until the fire load was knocked down and incident was placed under control. once under control truck 74 was reassigned too relieve overhaul crews for the duration of the incident.